At Cobnut homes, every successful building project begins with a solid and well-engineered foundation, as it ensures the long-term stability and safety of the structure. Once the site is cleared of debris and levelled, the construction process moves into three crucial stages: laying the footings, constructing the foundation, and framing the structure.

With the footings securely in place and the concrete pour completed, our team has now advanced to framing Plots 1 – 4. This phase involves constructing the skeleton of the building, and for this, we are utilizing trench blocks. Trench blocks offer numerous advantages in modern construction, such as enhanced durability, moisture resistance, and better thermal insulation. By using trench blocks in the framing process, we are not only ensuring a robust structural base but also setting the stage for energy efficiency and long-term performance. As the framing progresses, our team maintains a focus on precision and attention to detail, laying the groundwork for the next phases of the build.

This structured approach, from footings to framing, is key to delivering a high-quality, resilient building that meets the highest industry standards.

Check in next week for more exciting updates